Many older Mumbai buildings sit on plots too small to redevelop well on their own. Cluster redevelopment allows a group of neighbouring buildings to be planned and rebuilt as one scheme, with a higher floor space index (FSI) than each could get separately. Is a cluster scheme under Regulation 33(9) of the Development Control and Promotion Regulations for Greater Mumbai, 2034 (DCPR 2034) right for a society? In brief: a Cluster Development Scheme must cover a minimum contiguous area (4,000 sq m in the Island City; for the suburbs, recent secondary sources report 6,000 sq m, although MCGM’s published DCPR text shows 10,000 sq m), the buildings must generally be at least thirty years old or otherwise qualify, a prescribed share of occupants must give irrevocable written consent, and the scheme gets FSI of 4.00 or the rehabilitation FSI plus incentive FSI, whichever is more. The benefits are larger flats, better planning and amenities; the costs are complexity, time and the difficulty of getting many owners and societies to agree.
A word on sources before the details. Regulation 33(9) has been modified more than once since DCPR 2034 came into force in 2018, and figures circulating online differ. This article gives the structure of the regulation from MCGM’s DCPR text and flags figures that readers should confirm against the current notified version before relying on them.
What a Cluster Development Scheme is
Regulation 33(9) deals with reconstruction or redevelopment of clusters of buildings under Cluster Development Schemes (CDS). A scheme may be undertaken by MHADA or MCGM, by them jointly with landowners and co-operative housing societies of occupiers, or by landowners and societies independently or through a promoter or developer.
Clause 1.1 defines a CDS as a scheme for redevelopment of a cluster of buildings and structures over a minimum area, bounded by distinguishing physical features such as roads, nallas and railway lines, and accessible by a road of prescribed width. The minimum area in the Island City is 4,000 sq m. For the suburbs, the DCPR text published by MCGM gives 10,000 sq m, but MCHI’s 2021 analysis of the modified regulation and Business Standard’s 2025 reporting both give 6,000 sq m, which suggests the figure has since been modified. Confirm the current figure from the notified regulation.
The land under a CDS, whatever the tenure of the individual plots, is treated as one plot for FSI and marginal distances. A cluster may be identified by the Municipal Commissioner in an urban renewal plan, under the Development Plan, or by the promoter of the scheme; the Commissioner may not identify a cluster without an impact assessment study covering infrastructure, traffic and environment.
Which buildings can be included
Clause 1.2 allows a cluster to include a mix of structures, including:
- cessed buildings in the Island City governed by the Maharashtra Housing and Area Development Act, 1976;
- authorised buildings at least thirty years old, and buildings at least thirty years old acquired by MHADA (the 2021 modification, as summarised by MCHI, extended this to buildings reconstructed by MHADA);
- government, semi-government, MCGM and MHADA buildings at least thirty years old, with the prior consent of the department concerned;
- buildings certified as unfit for habitation or dangerous by the designated authority; and
- slum areas, provided they do not exceed fifty per cent of the cluster.
Age is calculated as on 1 January of the year the proposal is submitted, from the occupation certificate or, if there is none, from the first property tax assessment. Heritage buildings of Grade I and II, and structurally sound buildings, may be included but must be retained as they are.
FSI and incentive FSI
The basic rule
Under clause 6, the total permissible FSI for a CDS is 4.00 on the gross plot area (excluding reservations, road set-back and existing municipal roads), or the rehabilitation FSI plus the incentive FSI, whichever is more. This is exclusive of the fungible compensatory area under Regulation 31(3).
How incentive FSI is worked out
The incentive FSI is expressed as a percentage of the admissible rehabilitation area. It depends on two things:
- the Basic Ratio, which is the land rate (from the Annual Statement of Rates, for FSI 1) divided by the rate of construction for the area; and
- the size of the cluster.
The regulation sets out a table: the lower the Basic Ratio (that is, where land is cheaper relative to construction), the higher the incentive; and the larger the cluster, the higher the incentive at any given ratio. The Basic Ratio is fixed for the year in which the scheme is approved and the letter of intent issued, and does not change on later revision. The 2021 modification increased the incentive percentages, so older tables found online may be out of date.
Balance FSI shared with MHADA
If rehabilitation FSI plus incentive FSI is less than 4.00, the balance up to 4.00 is shared between MHADA and the promoter in built-up area, in proportions that again depend on the Basic Ratio. MHADA’s tenements may, with its approval, be provided elsewhere in the same or an adjoining ward on an equivalent value basis.
A simplified, hypothetical illustration
Suppose a cluster of 12,000 sq m in the suburbs, where the rehabilitation area required for all existing occupants is 20,000 sq m. Assume, purely for illustration, that the applicable incentive is 80 per cent of the rehabilitation area. The incentive FSI is then 16,000 sq m, and rehabilitation plus incentive is 36,000 sq m. At FSI 4.00, the scheme could support 48,000 sq m, so the balance of 12,000 sq m would be shared between the promoter and MHADA in the proportion the regulation prescribes for that Basic Ratio. The actual percentages must be taken from the current notified tables.
What occupants receive
Under clause 5, each eligible occupant is rehabilitated on ownership basis with carpet area equal to the area occupied in the old building, subject to a minimum for residential occupants. The original text set that minimum at 27.88 sq m. MCHI’s summary of the 2021 modification, and a Free Press Journal report of November 2025, both state that the minimum is now 35 sq m. Residential occupants also receive an “additional area” that increases with the size of the cluster, calculated on existing carpet area up to 100 sq m.
Clause 17 requires the promoter to create a corpus fund of at least Rs 50,000 per tenement, or as directed by the High Power Committee, for maintenance of the rehabilitation buildings for ten years. Societies negotiating with a developer usually seek a larger corpus by contract.
In November 2025, the State Revenue Department approved a concession for eligible residents receiving new homes in cluster schemes in the BMC area. According to the Free Press Journal, registration fees are waived for rehabilitation homes of 400 to 600 sq ft, and the whole carpet area is valued on a concessional basis for stamp duty instead of charging the extra area at ready reckoner or construction-cost rates. Members should check the notified order and how it applies to their scheme.
Consent requirements
Under the regulation
Clause 4(a), in the DCPR text published by MCGM, permits a CDS on the irrevocable registered written consent of not less than fifty-one per cent of the eligible occupants of each building or seventy per cent overall of the scheme. Business Standard’s 2025 reporting also gives seventy per cent. MCHI’s 2021 summary, however, describes the earlier requirement as fifty-one per cent of each building or sixty per cent overall, and notes that the modification allowed consent to be notarised rather than registered. Readers should confirm the current requirement from the notified regulation. Consent is not needed where MHADA or MCGM redevelops its own land directly without a developer.
The developer must also show ownership or development rights over at least seventy per cent of the land when submitting the proposal, and over the balance within one year of the letter of intent.
Within each housing society
A society joining a cluster still has to take its own decision. Each society therefore follows Rule 106C-13 of the MCS Rules (a special general meeting with a quorum of two-thirds of the total members, fourteen clear days’ notice, the Registrar’s representative, video recording, and approval by fifty-one per cent of the total members), and checks any directives issued by the State Government under Section 79A of the MCS Act that apply to it.
Who approves
Under clause 21, a High Power Committee headed by the Municipal Commissioner approves the scheme with the previous sanction of the Government, after which the Municipal Commissioner approves the plans. A decision of the High Power Committee is appealable as if it were an appeal under Section 47 of the Maharashtra Regional and Town Planning Act, 1966.
Pros and cons for a society
| Advantages | Disadvantages |
|---|---|
| Higher FSI than individual redevelopment on a small plot | Many owners and societies must agree; one holdout building can stall the scheme |
| Larger flats through additional area and a minimum flat size | Longer approval and construction timelines |
| Better layout, open space, roads and amenities | Land pooling, title and tenure issues across many plots |
| Statutory minimum corpus | Members’ building may be rebuilt later in a phased scheme |
| Possible phasing for clusters above the threshold area | Higher dependence on one developer’s finances over a long period |
| Stamp duty and registration concessions reported for rehabilitation homes | Rules have changed several times; figures must be checked |
Practical questions before joining a cluster
- Is the cluster of the minimum area, with the required road access?
- Which buildings are in, and do all qualify under clause 1.2?
- What does the developer propose for each building’s occupants: area, corpus, rent, and the phase in which each building is rebuilt?
- What consents has the developer already obtained, and what land rights does it hold?
- Has the society followed Rule 106C-13 and any applicable Section 79A directives in its own decision?
- What happens if the High Power Committee approval or the consents fall short?
Frequently Asked Questions
What is the minimum area for cluster redevelopment in Mumbai?
Regulation 33(9) prescribes 4,000 sq m in the Island City. For the suburbs, industry analysis of the 2021 modification and recent press coverage report 6,000 sq m, while MCGM’s published DCPR text shows 10,000 sq m; confirm the current figure from the notified text.
Does every member have to consent?
No. The regulation requires irrevocable written consent from at least fifty-one per cent of the eligible occupants of each building or a prescribed overall percentage for the scheme (seventy per cent in MCGM’s published text). Separately, each housing society must pass its own resolution under Rule 106C-13 of the MCS Rules.
What FSI does a cluster scheme get?
FSI of 4.00 on the gross plot area, or the rehabilitation FSI plus the incentive FSI, whichever is more, exclusive of fungible compensatory area.
Does a society joining a cluster still need its own general body decision?
Yes. The consent of occupants under Regulation 33(9) does not replace the society’s own decision. Each society should pass its resolution at a special general meeting held under Rule 106C-13 of the MCS Rules, and check any directives issued by the State Government under Section 79A of the MCS Act.
How old must a building be to be included?
Most categories require buildings to be at least thirty years old, calculated from the occupation certificate or first tax assessment. Cessed buildings, buildings certified dangerous or unfit, and qualifying slum areas are separate categories.
This article is for general information and is not legal advice.
- Development Control and Promotion Regulations 2034, Municipal Corporation of Greater Mumbai (PDF via OpenCity)
- Modified DCPR 2034 Notification vide 37(1AA)(c) dated 08.07.2021: Future of Redevelopment with 33(7) and 33(9) Cluster Development (MCHI)
- Cluster redevelopment in Mumbai races against time amid red tape (Business Standard)
- Mumbai Cluster Redevelopment: Govt Announces Full Waiver Of Registration Fees For 400–600 Sq Ft Homes (Free Press Journal)
This article is for general information only and is not legal advice or an invitation to engage the firm. Laws and judgments change; please obtain specific legal advice before acting.